COAL LOADING SUPERVISION – Kalimantan, Indonesia

Home / Our Experience / COAL LOADING SUPERVISION – Kalimantan, Indonesia

Shipping

COAL LOADING SUPERVISION – Kalimantan, Indonesia

Our team recently supervised the loading of a 77,000 MT coal cargo at an anchorage in Kalimantan, Indonesia. During pre-loading inspection, the cargo was found to be non-compliant with IMSBC Code temperature recommendations, with coal temperature exceeding 55°C.
To ensure safe loading, we implemented a thin-layer trimming method on each barge, allowing the cargo to cool to acceptable temperatures before transfer. Throughout the operation, we conducted continuous temperature checks, barge inspections, and onboard monitoring to ensure all coal loaded met the required safety condition. Although the procedure extended the loading timeline, the vessel ultimately sailed safely and arrived at the discharging port without incident.
A successful demonstration of our ability to manage high-risk bulk cargo operations while maintaining cargo safety.

CLIENTS

-

CATEGORY

Coal Cargo Supervision

View Project Report

HOW WE SOLVE THIS PROJECT

To ensure safe and compliant loading of the 77,000 MT coal cargo in Kalimantan, our team implemented a structured supervision workflow designed to control cargo temperature, maintain stability, and ensure full alignment with IMSBC Code procedures. Each stage of the operation was executed with strict monitoring to prevent safety risks and maintain cargo integrity during transfer to the vessel. Join the team as we ensure safe bulk cargo handling through continuous monitoring, proper trimming practices, and reliable reporting—providing clients with trusted oversight for high-risk cargo operations.

Join the community to insurance for the life and together make the life best. We providing the best insurance policy to customers.

Certified

Coal temperature checked to meet IMSBC Code limits.

Construction policy

Thin-layer trimming used to cool cargo and keep it stable.

Protect your life

Safety measures applied to prevent overheating risks.

Certified
82%
Success rates
95 %

CHECKOUT OUR SIMILAR WORK

Offshore

YYA PLATFORM REMOVAL

Offshore

ROA, WDA PLATFORMS AND 24” PIPELINE INSTALLATIONS ORF, ROA AND WDA (OFFSHORE WORKS)

Offshore

TYRA RE-DEVELOPMENT PROJECT

Offshore

NEW ORF / OFFSHORE RECEIVING FACILITY FOR LNG TRAIN 3

Offshore

MELIWIS DEVELOPMENT PROJECT

Shipping

COAL LOADING SUPERVISION – Kalimantan, Indonesia

Shipping

OIL REMOVAL SUPERVISION – Eastern Indonesia

Shipping

NICKEL ORE CARGO ASSESSMENT – Halmahera, Indonesia

Shipping

SOYBEAN CARGO DARKENING INVESTIGATION – Cilegon, Indonesia.

Shipping

FLOATING CRANE BOOM DAMAGE INVESTIGATION – Indonesia

Shipping

CONTAINER FIRE INCIDENT – Coconut-Shell Charcoal Cargo